Research note · Published 14 November 2026 · Market data to the 13 November close
英伟达财报超预期,但据报道 SEC 调查涉及会计问题,股价一周跌 23%,下文部分操作建议已调整。阅读中文更新。
Nvidia after Huang: how much of the demand is real?
The stock has lost a third of its value in five weeks on four separate shocks. One of them decides what the company earns next year: the charge that Nvidia has been financing its own customers to keep chips moving. This note separates what the filings prove from what is only reported, tests the “fake demand” claim against data Nvidia does not control, and works out what today’s price already assumes.
The short versionFive conclusions
- The financing is real, large and in the filings.Nvidia’s own quarterly report shows $530.5bn of commitments and guarantees at 26 July, against $184bn a quarter earlier. About $190bn of it props up customers. A larger piece, $279bn, is supply Nvidia has promised to buy.
- The demand is not a hoax.Cloud revenue, AI-lab revenue and the price of renting a GPU all accelerated this autumn, and Nvidia sets none of them. Compute is scarce. Chips no longer are: the bottleneck has moved to power and to capital.
- The growth rate is what gives way.Management said a quarter of next year’s business comes from labs it backs with its balance sheet, and its supply contracts are sized for 70% growth. The executive who reportedly tried to shrink that backing now runs the company. I expect the growth outlook to come down.
- The price already assumes a lot of that.At $162.85 the shares trade on 17.5 times this year’s expected earnings. By my arithmetic that discounts roughly a one-in-three chance of an outright fall in revenue next year. My own weighting puts fair value within about 10% of the price: fairly priced for a very wide range of outcomes, not cheap.
- The risk sits in one layer of the AI trade, not all of it.The evidence supports cutting concentration in companies that live on borrowed money and vendor support, and it does not support abandoning AI. Chip and infrastructure stocks fall together, so several of them amount to one position.
Action list · added 14 NovEvery Nvidia-linked stock: valuation, verdict, action
One line per stock, grouped by verdict. Prices are the 13 November close. “P/E” is the price divided by four times next quarter’s consensus earnings per share. “More attractive below” is the price at which that multiple would leave what I consider a margin of safety; it is not a forecast. Trim means cut to the size cap in section 8. Avoid means no new money, and any existing holding kept only at a size you could lose. This is my judgement from public data, not personal advice.
| Stock | Price, fall from high, P/E | Action and trigger |
|---|---|---|
| Add on dips: pays from its own cash flow, or owns what is scarce | ||
| Alphabet GOOGL | $295.79 −28% 23× | Best-placed gainer: its own chips, cloud revenue up 103%. More attractive below about $255 (20×). Watch free cash flow, which has been negative for two quarters. |
| Microsoft MSFT | $524.31 −6% 27× | The only big buyer still producing free cash. It has barely fallen, so there is no hurry; more attractive below about $486 (25×). |
| TSMC TSM | $398.63 −18% 19× | Makes the chips whoever wins. More attractive below about $350 (17×). Risks: Nvidia cuts that rivals do not backfill, and Taiwan. |
| Hold: fairly priced, or waiting on data | ||
| Nvidia NVDA | $162.85 −33% 16.5× | Do nothing before 17 November. Add afterwards only if next year’s outlook stays at +40% or better with days-to-collect at 60 or less, or if the price falls below about $135. Trim if the outlook is withdrawn or collection passes 65 days. |
| Broadcom AVGO | $346.66 −30% 23× | Gains share in custom chips, but its order book leans on OpenAI. Results 9 December. More attractive below about $300 (20×). |
| Amazon AMZN | $266.61 −7% 28× | AWS is speeding up, but free cash flow is −$42bn over twelve months and this is the richest multiple among the buyers. More attractive below about $222 (23×). |
| Meta META | $641.99 −18% 19× | Cheapest of the buyers, with no cloud revenue to pay for its capex. Watch how the spending is funded. |
| Arista ANET | $197.37 −9% 39× | Its customers pay from cash flow, and it gains if buyers move to open networking. The price already says so; more attractive below about $150 (30×). |
| Marvell MRVL Lumentum LITE | $156.74, −52%, 38× $597.12, −48%, 26× | Custom chips plus optics. Each Lumentum share becomes 4.5 Marvell shares, worth $705 today, so Lumentum is 15% cheaper for the same company. The gap is the price of a deal that closes in 2028. |
| Dell DELL | $344.36 −42% 13× | Record AI orders, thin margins, and it ships what Nvidia ships. Results on 24 November decide it. |
| Vertiv VRT | $202.04 −47% 22× | Power and cooling are the real bottleneck. The risk is local opposition slowing new sites. Add only if fourth-quarter orders hold up. |
| Trim: peak earnings, or priced for perfection | ||
| Micron MU | $778.40 −38% 5× | The 5× multiple sits on peak earnings: revenue is 4.8 times last year’s. Memory is the bulk of Nvidia’s $279bn of supply commitments, so it is first in line if Nvidia buys less. Keep only what you could hold through a halving. |
| AMD AMD | $534.09 −19% 47× | A share gainer on paper, at the highest multiple here, and it needs a 37% jump in next quarter’s earnings. More attractive below about $345 (30×). |
| Avoid: inside the financing loop, or earnings the market does not trust | ||
| CoreWeave CRWV | $53.11 −62% loss-making | Debt of $47bn is 1.6 times its market value. A good quarter, but it lives on Nvidia’s support and open lenders. Speculative size only. |
| Nebius NBIS | $115.81 −61% loss-making | The better small cloud: contracts with Microsoft and Meta, and Nvidia owns 9.3%. Still about 9 times this year’s sales and tied to the same funding window. Small size if at all. |
| Oracle ORCL | $125.40 −50% 17× | Looks cheap. Free cash flow was −$23.7bn last fiscal year and the backlog rests on OpenAI. |
| Super Micro SMCI | $26.87 −48% 4× | A 4× multiple means the market does not believe the earnings: thin margins, heavy funding needs, reported order cancellations. |
| Intel INTC | $59.67 −58% 65× | Not an AI-demand story, and its October outlook was weak. Nvidia’s shareholding does not change its earnings. |
Who is most likely to gain from Nvidia’s trouble
- Alphabet. It sells the main alternative chip and rents it out. Every doubt about Nvidia strengthens its hand with customers.
- Broadcom and Marvell (with Lumentum). They design the custom chips the big clouds switch to, and custom-chip vendors reportedly stand ready to take any TSMC capacity Nvidia gives up.
- Microsoft, Amazon and Meta. As buyers they get better prices and terms. If Nvidia stops propping up small clouds, that demand comes back to the large ones.
- AMD. The second source for general-purpose AI chips. The gain is real and already in the price.
- Arista. It gains if buyers pair custom chips with open networking in place of Nvidia’s full system.
- Buyers of compute. AI labs and software firms pay less if Nvidia stops supporting prices. TSMC is roughly neutral: it sells to the winner either way.
One caution. On 13 November AMD and Broadcom fell further than Nvidia did. The market is treating this first as a scare about total AI spending and only second as a shift in share. These companies gain relative to Nvidia; they gain outright only if the big buyers’ budgets hold. The likely losers are the memory makers, the small AI clouds, Oracle and the server assemblers.
1 · What happenedFour shocks, and only some of them change how many chips get bought
Nvidia daily closing price
US dollars, 1 October to 13 November 2026. Numbers mark the events listed below.
- 16 Oct · Peak. Closing high of $239.24, a market value near $5.9tn.
- 221–30 Oct · Capital. Big-tech results show AI spending running past cash flow: capex at the four largest buyers was about 115% of their operating cash flow, and Alphabet, Amazon and Meta reported negative free cash flow.19
- 35 Nov · Politics. Two days after the US midterm elections Nvidia fell 9.3%, its worst day since January 2025, on expectations of tougher AI and data-centre rules. Of 45 ballot measures to restrict data centres, 44 passed, by one consultancy’s count.23
- 48–10 Nov · Leadership and supply. Jensen Huang told staff of an extramarital affair; the board opened an independent review of reports that he had been targeted by a foreign intelligence effort, and said it had no reason to think company secrets were compromised. A Taiwanese paper reported, from one unnamed source, that Nvidia may slow orders at TSMC.12
- 512 Nov · Resignation. Huang left as chief executive and director after 33 years. Finance chief Colette Kress became interim CEO and Harvey Jones the first board chair. The shares opened 13% lower and closed down 4.3% on about five times normal volume.3,10
- 613 Nov · Financing. Accounts of a Wall Street Journal investigation describe Nvidia funding customers to absorb supply it had already ordered.7
Data table: daily closes
| Date | Close | Change |
|---|---|---|
| 2026-10-01 | $230.86 | |
| 2026-10-02 | $233.95 | +1.3% |
| 2026-10-05 | $238.90 | +2.1% |
| 2026-10-06 | $239.24 | +0.1% |
| 2026-10-07 | $237.47 | −0.7% |
| 2026-10-08 | $230.48 | −2.9% |
| 2026-10-09 | $229.28 | −0.5% |
| 2026-10-12 | $226.32 | −1.3% |
| 2026-10-13 | $228.52 | +1.0% |
| 2026-10-14 | $221.30 | −3.2% |
| 2026-10-15 | $217.23 | −1.8% |
| 2026-10-16 | $214.13 | −1.4% |
| 2026-10-19 | $217.09 | +1.4% |
| 2026-10-20 | $216.47 | −0.3% |
| 2026-10-21 | $221.97 | +2.5% |
| 2026-10-22 | $212.21 | −4.4% |
| 2026-10-23 | $210.96 | −0.6% |
| 2026-10-26 | $216.00 | +2.4% |
| 2026-10-27 | $217.94 | +0.9% |
| 2026-10-28 | $215.38 | −1.2% |
| 2026-10-29 | $213.66 | −0.8% |
| 2026-10-30 | $204.64 | −4.2% |
| 2026-11-02 | $202.06 | −1.3% |
| 2026-11-03 | $206.69 | +2.3% |
| 2026-11-04 | $200.13 | −3.2% |
| 2026-11-05 | $181.60 | −9.3% |
| 2026-11-06 | $186.64 | +2.8% |
| 2026-11-09 | $178.67 | −4.3% |
| 2026-11-10 | $168.89 | −5.5% |
| 2026-11-11 | $173.73 | +2.9% |
| 2026-11-12 | $166.19 | −4.3% |
| 2026-11-13 | $162.85 | −2.0% |
These are different kinds of risk and they deserve different weights. The capital squeeze, the political backlash and the financing story all bear on the number of chips customers can buy and plug in. The leadership shock bears on who runs the company. Huang had about 60 direct reports and no named successor,11 so a discount for execution is reasonable, but his exit did not cancel an order. The export-control inquiry in Congress is a tail risk more than a forecast item: Nvidia’s outlook already assumes no data-centre chip revenue from China.2,30
2 · Circular financingWhat is proven, what is reported, and what is noise
“Circular financing” means a supplier funds a customer who then spends the money on the supplier’s product. The question for an investor is how much of it there is and who carries the loss if the customer cannot pay. On that, the best source is Nvidia itself.
| Claim | Status | Basis |
|---|---|---|
| In Nvidia’s own filings and statements | ||
| Commitments and guarantees of $530.5bn at 26 July, from $184bn three months before | ✓ Proven | 10-Q, as tallied by Hunterbrook and SemiAnalysis1,4,29 |
| A guarantee of up to $105bn on leases for a 4.25-gigawatt Ohio campus built for OpenAI, starting in fiscal 2029 and ending if OpenAI earns a satisfactory credit rating | ✓ Proven | 10-Q1 |
| $36bn of promises to buy unused capacity from smaller AI clouds, and $20bn of leases signed to hand on to them | ✓ Proven | 10-Q1 |
| $99bn of equity stakes in customers and partners, with $25bn more promised | ✓ Proven | 10-Q1 |
| Payment terms stretched to between “90 days up to one year” for some buyers; receivables up $24.6bn in six months to $63.1bn, with five customers owing 70% of it | ✓ Proven | 10-Q1 |
| Labs backed by Nvidia’s balance sheet will supply about a quarter of next year’s business | ✓ Proven | Kress, 26 August results call5 |
| Reported by the press, not confirmed by Nvidia | ||
| In August Kress pushed to cap customer support, Huang resisted, and the OpenAI guarantee was cut by about half | ? Plausible | WSJ, via other outlets. It fits the record: Bloomberg reported talks for up to $250bn in July, and the filing shows a $105bn cap6,7 |
| Huang privately called incoming wafer and memory commitments an “avalanche”, while the biggest clouds shifted toward their own chips | ? Plausible | WSJ, via other outlets. It fits the filing: supply commitments rose from $119bn to $279bn in a quarter, and sales to hyperscalers grew more slowly than sales to everyone else7,27 |
| Nvidia has asked TSMC to slow chip orders | ? Thin | One unnamed supply-chain source in Taiwan’s Commercial Times; other industry sources say orders are unchanged9 |
| Circulating widely, not supported by evidence I could find | ||
| The chip shortage was engineered and the demand is fake | ✕ Unsupported | An interpretation added by technology blogs. It conflicts with the independent data in section 38 |
| $200bn of Nvidia chips sit idle in warehouses | ✕ Unverified | One commentator’s estimate from construction balances. The direction has support (Amazon racks waiting for power), the size does not, and waiting for power is not the same as unwanted20 |
Where the $530.5bn sits
Nvidia’s commitments and guarantees at 26 July 2026, US$ billions. Guarantees are shown at their maximum, not at expected loss.
- Supply it has promised to buy · $279bn
- Support for customers · $189.5bn
- Its own operations · $62bn
“Circular” describes about a third of the total. More than half is the opposite problem: chips and memory Nvidia must take whether or not anyone wants them. Of the $279bn, $92bn falls due in the two quarters to January. That is $46bn a quarter, against a cost of revenue of $24bn last quarter. Some of it is prepaid factory capacity and not inventory, and 70% growth next year would absorb the rest. Slower growth would not.
That is the “avalanche” in numbers. The supply chain is contracted for the bull case, and financing customers was the tool for making the bull case happen. None of it was hidden; it is in the accounts. It was a bet that buyers’ ability to pay would catch up with supply already ordered.
3 · The demand testThree measures Nvidia does not control
If demand were manufactured, the evidence would show up downstream: clouds unable to sell capacity, AI products without paying users, and falling prices for compute. The opposite happened this autumn.
| Measure | Latest | Earlier | Reading |
|---|---|---|---|
| Cloud revenue growth, Q3 202613 | AWS +39%, Azure +48%, Google Cloud +103%; $110bn in the quarter | +20%, +40%, +34% a year before | All three sped up |
| Signed cloud backlog13 | AWS $578bn, Google Cloud $561bn | $496bn and $514bn in June | Customers are committing years ahead |
| AI-lab revenue run-rate14,15 | Anthropic $81bn (31 Oct), OpenAI about $50bn | About $9bn (end-2025) and $25bn (February) | End users are paying. Run-rates flatter: Anthropic’s booked third-quarter revenue annualises nearer $68bn |
| GPU rental price17 | H100 index $3.01 an hour (9 Nov); B200 $9.84, up 32% in a month | H100 at $2.00 in December 2025 | A three-year-old chip rents for 50% more than last December |
| CoreWeave, Q318 | Revenue +168%; backlog $132.5bn | Backlog $104bn in June | The most levered buyer is still filling its capacity |
The other side of the ledger is just as well documented:
- Buyers are running out of their own cash. The four largest spent about $202bn on capex in the third quarter. The three big clouds’ combined revenue was about $39bn higher than a year earlier. The revenue is real and accelerating; the investment is still several times ahead of it. Five big-tech issuers sold $218bn of investment-grade bonds by early October, more than double all of 2025.19
- Chips are arriving before the power does. Amazon began paying for Nvidia racks on arrival and storing some in warehouses because sites lacked electricity, according to Business Insider.20
- The largest customers are building substitutes. Broadcom’s AI-chip revenue rose 221% to $16.7bn in its August quarter. One tracker puts Nvidia’s share of accelerator revenue near 75% this year, from 87% in 2024.21
- The labs’ promises exceed their means. OpenAI reportedly carries about $665bn of purchase commitments and expects to burn roughly $278bn through 2030.22
Both sets of facts fit one picture. People and companies are paying for AI at a rate that is growing faster than almost any business on record, and the capacity to serve them is short, which is why rental prices are rising. What is short is powered, financed data-centre capacity. Chips are now arriving faster than sites can be switched on and faster than buyers’ cash flow can pay for them. Nvidia lent its balance sheet so that shipments kept pace with its supply contracts.
So the demand is real and Nvidia’s shipments have run ahead of it. That is how a semiconductor inventory cycle begins, and it does not need a fictional end market. Cisco’s revenue fell 15% in its 2002 fiscal year while internet traffic kept growing.
4 · Earnings qualityWhere the strain already shows
Nvidia data-centre revenue by type of buyer
US$ billions per quarter. The group Nvidia supports financially is the faster-growing one.
- Hyperscale · +102% in a year
- AI clouds, AI-native firms, enterprise, sovereign · +138% in a year
- Growth is tilting toward the supported bucket. Sales to hyperscalers rose 13% in the latest quarter; sales to everyone else rose 25% and now make up 45% of the data-centre total. Nvidia’s financing is aimed at that second group.
- Profit is turning into cash more slowly. Second-quarter operating cash flow was $24.1bn on net income of $59.7bn. Free cash flow fell to $21.3bn from $48.6bn the quarter before, as receivables absorbed $22bn and inventory $6bn.26
- Reported profit includes gains on customers’ shares. Net gains on Nvidia’s equity stakes were $23.7bn in the first half, about 17% of pre-tax income.4 The valuation below uses adjusted earnings, which leave those gains out.
- Stock is building. Inventory reached $31.6bn, from $21.4bn in January.1
5 · The historical parallelLucent: right about the mechanism, wrong about the balance sheet
The comparison everyone reaches for is the telecom-equipment makers of 2000, which lent to start-up carriers so the carriers could buy their gear. It deserves a direct look.
| Lucent, 2000 | Nvidia, July 2026 | |
|---|---|---|
| Customer financing commitments | $8.1bn | About $190bn in guarantees, capacity promises, leases and unpaid equity pledges |
| As a share of a year’s revenue | 24% | 63% of trailing revenue of $303bn |
| Cash generated in a year | $0.3bn operating cash flow | About $140bn free cash flow, at the first-half rate |
| Years of cash flow to cover every commitment | About 27 | About 1.4 |
| Who was financed | Start-up carriers funded by junk bonds | Labs with $50bn–80bn revenue run-rates and far larger spending commitments, plus thinly capitalised AI clouds |
Relative to sales, Nvidia has gone further than Lucent did. Relative to cash, it is in a different position. If every guarantee were called at its maximum, which would require OpenAI to default on 20-year leases that do not begin until fiscal 2029, the bill would be about nine months of free cash flow, and Nvidia would be left holding a powered 4.25-gigawatt campus filled with its own systems. This threatens the growth rate and the valuation multiple. It does not threaten solvency.24
6 · ValuationWhat $162.85 assumes
Seventeen times earnings looks cheap for a company that doubled its sales. It is also how cyclical companies look at the top of a cycle, when the “E” is about to fall. The right question is which year-ahead earnings the price is built on. Three cases for the year to January 2028:
- A · Guidance holds. Revenue grows the 70% management sketched in August. This needs customer financing to continue and sites to get power.
- B · Financing reined in. The balance-sheet-backed quarter of the business does not ship. Revenue still grows 28%.
- C · Digestion. Buyers work through chips already delivered. Revenue falls 25% and margins compress on write-downs and price cuts. Nvidia’s own precedent is fiscal 2023, when quarterly revenue fell 28% from peak to trough and the shares lost about two-thirds.
Share value in three cases
US dollars per share. Bars span 15 to 20 times earnings; the dot marks the value at the multiple I think fits each case.
| Case | Central value | vs price | Weights implied by price | My weights |
|---|---|---|---|---|
| A · Guidance holds | $268 | +64% | 20% | 25% |
| B · Financing reined in | $168 | +3% | 45% | 50% |
| C · Digestion | $94 | −43% | 35% | 25% |
| Probability-weighted value | $162 | $174 |
The market is pricing about a one-in-three chance of an outright revenue decline and a one-in-five chance that August’s guidance survives. I am a little less pessimistic about the bust, because the independent demand data are strong, and that gets me to $174, or 7% above the price. A gap that small is well inside the error of the inputs. The shares are priced about right for the risk, with outcomes ranging from −43% to +64%.
Two further observations. On 12 November individual investors bought the opening dip at the heaviest rate Vanda Research has recorded,10 which is not what a washed-out stock looks like. And the person now in charge was, by the Journal’s account, the internal critic of the financing. An interim chief with a finance chief’s instincts has every reason to reset expectations early. That makes case B the likeliest and makes 17 November the date it may start to show.
7 · The wider industryWho carries the risk if the financing slows
Fall from 52-week high
Per cent, at the 13 November close. The market has already drawn a line between the layers.
- Capacity built on debt
- Chip suppliers
- Hyperscale buyers
| Layer | What a financing pullback does | Evidence so far |
|---|---|---|
| Capacity built on debt CoreWeave, other AI clouds, data-centre developers, Oracle | Most exposed. Their growth depends on Nvidia’s support and on lenders staying open | CoreWeave owes almost $47bn and some of its bonds yielded over 16%, though its third quarter beat forecasts. Oracle’s free cash flow was −$23.7bn last fiscal year18,31 |
| Nvidia’s suppliers Memory makers, packaging, TSMC | Exposed if Nvidia trims orders. Memory is most at risk, since it is the bulk of the $279bn | TSMC has a cushion: custom-chip customers reportedly would take any capacity Nvidia frees. Nvidia was 19% of TSMC’s 2025 revenue9,28 |
| Rival silicon Broadcom, AMD, Google’s TPU | Gaining share, but selling into the same capex budgets | AMD trades on 116 times trailing earnings and fell 8.7% on 13 November, more than four times Nvidia’s 2.0% |
| Hyperscale buyers Microsoft, Alphabet, Amazon, Meta | A chip glut lowers their costs, and they own the powered sites that are actually scarce. Their risk is their own cash burn | Microsoft alone had positive free cash flow in the third quarter. Microsoft and Amazon sit 6–7% below their highs19 |
| AI labs OpenAI, Anthropic and others | Cheaper compute helps them; a shut funding window hurts them more than anyone | Their revenue is the strongest evidence that demand is real, and their commitments are the largest unfunded promises in the chain |
A bust for the builders need not be a bust for the technology. If Nvidia stops supporting prices with financing, compute gets cheaper, and that helps everyone who buys it. The fibre glut of 2001 ruined the companies that laid the cable and made the next decade of the internet cheap. In that kind of cycle value moves from the sellers of capacity to its users.
8 · Position sizingShould you hold less AI?
The data do not answer that for any one portfolio. They do support a way of working it out.
- Sort holdings by who pays them. Spending funded from operating cash flow is the most durable. Spending funded by debt and vendor support is the least. Spending funded by venture and IPO money sits between. The risk described in this note is concentrated in the second group.
- Count correlated positions as one. On 13 November AMD fell 8.7%, CoreWeave 6.2%, Broadcom 4.9%, the semiconductor ETF SMH 3.0% and Nvidia 2.0%, while Meta rose 2.9% and Microsoft 0.3%. Five chip names are one bet.
- Size from the bad case.
Largest sensible weight = loss you could accept on the whole portfolio ÷ fall in the bad caseWith a bad case of −43% and a tolerance of 3% of the portfolio, that is about 7%. For a levered name where −60% is plausible, it is 5%.
- Do not treat a low P/E as the safety margin. In a cyclical business the multiple is lowest when earnings are highest.
The case for trimming is strongest where the business model is the financing loop: borrowed money buying chips on the strength of long contracts with a handful of young labs. It is weakest where spending comes out of cash flow and where the company owns what is scarce, meaning power, sites and paying users. On Nvidia itself, valuation alone does not justify adding before 17 November: the next catalyst is information, and the spread of outcomes is wide. A holder already above the weight that rule 3 gives has a reason to trim that does not depend on any forecast. A holder below it gives up little by waiting three days for the numbers.
9 · What would change this viewA checklist for 17 November and after
| Indicator | Now | Reassuring | Warning |
|---|---|---|---|
| Outlook for the year to Jan 2028 | About +70% (August) | Reaffirmed with less customer support | Cut below about +40%, or withdrawn |
| Days to collect a sale | 60 | Back toward 50 | Above 65 |
| Supply commitments | $279bn | Flat or lower | Higher again |
| Guarantees plus capacity promises | $144.5bn | Flat; no new very large guarantee | The $100bn OpenAI equity plan signed with chip orders attached |
| Hyperscale vs other growth, quarter on quarter | 13% vs 25% | Hyperscale picks up | The gap widens |
| H100 rental index | About $3.00 an hour, rising | Holds above $2.50 | Below $2.00, the December 2025 level |
| Hyperscalers’ 2027 capex guidance (January–February) | Alphabet: “increase significantly”16 | Maintained | Cut |
| Funding window | Anthropic IPO due to price 18 Nov; some CoreWeave bonds above 16% | Offering clears; yields fall | Offering pulled or trades down; yields rise |
Consensus for the quarter is revenue of about $109bn and adjusted earnings of $2.47 a share, against guidance of $108bn give or take 2%.25 The headline numbers matter less than the eight lines above.
Method and sourcesHow this was put together
Prices, market values, consensus earnings and 52-week ranges come from Robinhood market data at the 13 November close. Company figures come from Nvidia’s results release and Form 10-Q for the quarter ended 26 July 2026. Every ratio, growth rate and scenario value was computed from those inputs and checked by script. Historical figures for Cisco (fiscal 2002) and Nvidia (fiscal 2023) come from the companies’ annual reports. Where a source is a secondary account of paywalled reporting, the entry says so.
- Nvidia, Form 10-Q for the quarter ended 26 July 2026 (SEC).
- Nvidia, Financial results for second quarter fiscal 2027, 26 Aug 2026.
- Nvidia, NVIDIA announces CEO transition, 12 Nov 2026.
- Hunterbrook, The Comprehensive Guide to the Bank of Nvidia, Nov 2026.
- AI News, A quarter of Nvidia’s business next year comes from labs it is financing, Aug 2026.
- Bloomberg, Nvidia’s $750 Billion in Deals Reignite Circular AI Fears, 27 Jul 2026.
- Wccftech, account of the Wall Street Journal investigation, 13 Nov 2026 (secondary).
- TechPowerUp, NVIDIA Allegedly Engineered Scarcity, 13 Nov 2026 (secondary).
- TrendForce, NVIDIA order cuts reportedly loom, 10 Nov 2026 (relaying Commercial Times).
- CNBC, Nvidia stock closes down over 4% after Huang announces resignation and live updates, 12 Nov 2026.
- TechCrunch, Nvidia’s Jensen Huang resigns; Decrypt, Huang resigns as Nvidia CEO, 12 Nov 2026.
- TechPowerUp, NVIDIA May Cut TSMC Chip Orders, Nov 2026.
- Midgard Finance, AWS vs Azure vs Google Cloud; Cleus, Amazon Q3 2026; Tech Insider, Cloud market share Q3 2026.
- TechCrunch, OpenAI’s quarterly revenue reportedly crosses $10B, 11 Nov 2026; Value Add VC, run-rate history.
- 24/7 Wall St., Anthropic’s $81 billion run rate, 11 Nov 2026 (on the S-1 amendment); Blockonomi, AI revenue statistics 2026.
- Yield Theory, Hyperscaler capex 2026: guidance by company, Nov 2026.
- gr1d, Rent or buy GPU servers (Silicon Data index); Ornn, GPU cloud price comparison, Nov 2026.
- CNBC, CoreWeave beats on revenue and lifts guidance, 10 Nov 2026.
- Walnut, AI capex tracker; Technology.org, AI capex now outruns Big Tech cash flow, 9 Nov 2026.
- Benzinga, Amazon’s Nvidia chips are sitting in warehouses without power, Oct 2026 (relaying Business Insider).
- AI World Today, How custom AI chips are challenging Nvidia; Safeguard, AI chip market share 2026.
- New Market Pitch, Can OpenAI actually afford all this compute? (relaying The Information and the Financial Times).
- Built In, What the 2026 midterm results mean for the AI industry; Gotrade, Nvidia stock news, 6 Nov.
- Tomasz Tunguz, Nvidia and the Lucent vendor-financing comparison (Lucent figures).
- Yahoo Finance, Nvidia reports earnings Tuesday; Invezz, earnings preview, Nov 2026.
- Yahoo Finance, $27 billion of free cash flow vanished; TIKR, Nvidia wants to earn twice.
- GPU Insights, NVIDIA data center revenue: the Q2 FY27 split.
- TIKR, Nvidia was 19% of TSMC’s 2025 sales, Nov 2026.
- Tiger Brokers, NVIDIA off-balance-sheet commitments soar to $530 billion (relaying SemiAnalysis).
- International Business Times, Nvidia scandal draws Congress into China chip probe, Nov 2026.
- Let’s Data Science, Big Tech AI capex set to outrun cash flow (relaying Epoch AI).